Surface Coal Handling for Gateway Mine North

Design of surface material handling at Gateway Mine North Portal beginning at the intermediate tower of the slope belt

and extending through the surge bin discharge feeder, Overland Conveyor A, Overland Conveyor B and upgrade of existing

Overland Conveyor C including structural, foundation and mechanical design.

Gateway North Mine Surface Coal Handling

Union Pacific Railroad Crossing at Gateway North Mine

Tube Truss Roadway Crossing

MINING & MINERALS PROCESSING - MECHANICAL - STRUCTURAL- CIVIL- FORENSIC - 3-D DESIGN & ANMIMATION


 

© 2014 by FMC Engineering